SiteControl demo

Wed 25 Nov · due 19:00 · past cut-off, will be marked late

Excavation and groundworks

Already filed today — resubmitting replaces it.

Trench excavation (m3)

399 of 850 m3 done to date.

Murram delivered (trips)

Each trip adds 7 m3 to stock.

Photo attached: view

This link is the credential — in production each department gets its own.